Skip to main content

2024 | OriginalPaper | Buchkapitel

AHP Framework for Prioritising Risk Factors in Bridge Construction

verfasst von : Shreyas Sandip Sawant, Abhaysinha Gunvantrao Shelake, Nivedita Gunesh Gogate

Erschienen in: Recent Advances in Structural Engineering

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

With increase in scale of road construction in India, it has become increasingly difficult to assess the timely completion of bridge construction. The major issue for delay is poor management of associated risks on projects. Moreover, the complexity of bridge projects further adds variety of risk factors. It is important to concentrate only on most significant risk factors which are having highest impact on timely completion of project. In this work the author brought an Analytical Hierarchical Processes (AHP) approach to identify most significant risk factors on bridge construction which are responsible for delay. Around 25 bridge case studies are considered for work. The long list of risk factors is formulated through repository of literature and bridge expert’s opinions. In the framework initially risk factors are divided in 3 level hierarchy for eliciting weightages. Then, the matrix is prepared using the pairwise comparison and the final weightages are obtained through AHP procedure. These weights are further used for prioritisation of risk factors. The main intent of this work to produce robust framework in prioritisation of risk factors predicted in bridge construction.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Project implementation status report of central sector projects costing Rs. 150 crore & above-22 (QTR-2nd) port trust-setting up of LNG regasification terminal at Puthuvypeen Cochin Project implementation status report of central sector projects costing Rs. 150 crore & above-22 (QTR-2nd) port trust-setting up of LNG regasification terminal at Puthuvypeen Cochin
2.
Zurück zum Zitat Government of India ministry of road transport and highways annual report Government of India ministry of road transport and highways annual report
3.
Zurück zum Zitat Vigneshwaran P, Arunpandiyan M, Ashwinkumar C, Balaji M, Chandrasekaran R (2019) A study on construction challenges of bridges in the hilly areas of Tamil Nadu 1 Vigneshwaran P, Arunpandiyan M, Ashwinkumar C, Balaji M, Chandrasekaran R (2019) A study on construction challenges of bridges in the hilly areas of Tamil Nadu 1
6.
Zurück zum Zitat Madhumitha TS (2020) Analysing and managing bridge construction projects in India. Int Res J Eng Technol (Online). Available: www.irjet.net Madhumitha TS (2020) Analysing and managing bridge construction projects in India. Int Res J Eng Technol (Online). Available: www.​irjet.​net
7.
Zurück zum Zitat Muhammad Choudhry R, Ali Aslam M (2011) Risk analysis of bridge construction projects in Pakistan Muhammad Choudhry R, Ali Aslam M (2011) Risk analysis of bridge construction projects in Pakistan
12.
Zurück zum Zitat Tayade AM, Mahatme PS, Sabihuddin S (2008) Delay in bridge construction and analysis by RII method. Int Res J Eng Technol (Online). Available: www.irjet.net Tayade AM, Mahatme PS, Sabihuddin S (2008) Delay in bridge construction and analysis by RII method. Int Res J Eng Technol (Online). Available: www.​irjet.​net
16.
Zurück zum Zitat Saaty RW (1987) The analytic hierarchy process-what it is and how it is used Saaty RW (1987) The analytic hierarchy process-what it is and how it is used
Metadaten
Titel
AHP Framework for Prioritising Risk Factors in Bridge Construction
verfasst von
Shreyas Sandip Sawant
Abhaysinha Gunvantrao Shelake
Nivedita Gunesh Gogate
Copyright-Jahr
2024
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-99-9502-8_21