Skip to main content
Top

2024 | OriginalPaper | Chapter

Task-Based DSM Model for Aircraft Heavy Maintenance Planning

Authors : Kusol Pimapunsri, Pattarawit Srimuang, Darawan Weeranant

Published in: Advanced in Creative Technology- added Value Innovations in Engineering, Materials and Manufacturing

Publisher: Springer Nature Switzerland

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Aircraft heavy maintenance (AHM) is frequently delayed due to the large number of maintenance tasks involved. This can lead to significant costs for airlines, as maintenance is the third highest annual operating cost. This paper presents a task-based DSM model for solving the complexity of AHM planning. The model uses DSM partitioning analysis to sequence AHM tasks. If coupled blocks are present after the sequencing analysis, the aggregation, decomposition, and tearing methods are used to resolve them. The task-based DSM model also uses heuristic priority rules to determine the priority of tasks and to allocate limited resources. The results of the study show that the developed task-based DSM model performs efficiently compared to the current method in terms of planning lead time and maintenance expected time.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Browning, T.R.: Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans. Eng. Manage. 48(3), 292–306 (2001)CrossRef Browning, T.R.: Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans. Eng. Manage. 48(3), 292–306 (2001)CrossRef
2.
go back to reference Browning, T.R.: Design structure matrix extensions and innovations: a survey and new opportunities. IEEE Trans. Eng. Manage. 63(1), 27–52 (2016)CrossRef Browning, T.R.: Design structure matrix extensions and innovations: a survey and new opportunities. IEEE Trans. Eng. Manage. 63(1), 27–52 (2016)CrossRef
4.
go back to reference Department for Business Innovation & Skills (2016). BIS research paper number 275: UK aerospace maintenance, repair, overhaul and logistics industry analysis Department for Business Innovation & Skills (2016). BIS research paper number 275: UK aerospace maintenance, repair, overhaul and logistics industry analysis
5.
go back to reference Eppinger, S.D., Whitney, D.E., Smith, R.P., Gebala, D.A.: Organizing the tasks in complex design projects. In: Proceedings of the ASME Conference on Design Theory and Methodology, Chicago, IL, pp. 39–46 (1990) Eppinger, S.D., Whitney, D.E., Smith, R.P., Gebala, D.A.: Organizing the tasks in complex design projects. In: Proceedings of the ASME Conference on Design Theory and Methodology, Chicago, IL, pp. 39–46 (1990)
6.
go back to reference Eppinger, S.D., Whitney, D.E., Smith, R.P., Gebala, D.A.: A model-based method for organizing tasks in product development. Res. Eng. Design 6(1), 1–13 (1994)CrossRef Eppinger, S.D., Whitney, D.E., Smith, R.P., Gebala, D.A.: A model-based method for organizing tasks in product development. Res. Eng. Design 6(1), 1–13 (1994)CrossRef
7.
go back to reference Eppinger, S.D., Browning, T.R.: Design Structure Matrix Methods and Applications. The MIT Press, Cambridge (2012)CrossRef Eppinger, S.D., Browning, T.R.: Design Structure Matrix Methods and Applications. The MIT Press, Cambridge (2012)CrossRef
8.
go back to reference Friend, C.H.: Aircraft Maintenance Management. Longman (1992) Friend, C.H.: Aircraft Maintenance Management. Longman (1992)
9.
go back to reference Gray, C.F., Larson, E.W.: Project Management: The Managerial Process. McGraw-Hill, New York (2020) Gray, C.F., Larson, E.W.: Project Management: The Managerial Process. McGraw-Hill, New York (2020)
10.
go back to reference Gebala, D.A., Eppinger, S.D.: Methods for analyzing design procedures. In: Proceedings of the ASME Design Technical Conferences (Design Theory and Methodology), Miami, FL, pp. 227–233 (1991) Gebala, D.A., Eppinger, S.D.: Methods for analyzing design procedures. In: Proceedings of the ASME Design Technical Conferences (Design Theory and Methodology), Miami, FL, pp. 227–233 (1991)
11.
go back to reference Pimapunsri, K., Weeranant, D.: Solving complexity and resource-constrained project scheduling problem in aircraft heavy maintenance. Int. J. Appl. Eng. Res. 13(11), 8998–9004 (2018) Pimapunsri, K., Weeranant, D.: Solving complexity and resource-constrained project scheduling problem in aircraft heavy maintenance. Int. J. Appl. Eng. Res. 13(11), 8998–9004 (2018)
12.
go back to reference Pimapunsri, K., Weeranant, D., Riel, A.: Genetic algorithms for resource-constrained project scheduling problem in aircraft heavy maintenance. Suranaree J. Sci. Technol. 28(6), 1–8 (2021) Pimapunsri, K., Weeranant, D., Riel, A.: Genetic algorithms for resource-constrained project scheduling problem in aircraft heavy maintenance. Suranaree J. Sci. Technol. 28(6), 1–8 (2021)
13.
go back to reference Qin, Y., Wang, Z.X., Chan, F.T., Chung, S.H., Qu, T.: A mathematical model and algorithms for the aircraft hangar maintenance scheduling problem. Appl. Math. Model. 67, 491–509 (2019)MathSciNetCrossRef Qin, Y., Wang, Z.X., Chan, F.T., Chung, S.H., Qu, T.: A mathematical model and algorithms for the aircraft hangar maintenance scheduling problem. Appl. Math. Model. 67, 491–509 (2019)MathSciNetCrossRef
14.
go back to reference Steward, D.V.: The design structure system: a method for managing the design of complex systems. IEEE Trans. Eng. Manage. 28, 71–74 (1981)CrossRef Steward, D.V.: The design structure system: a method for managing the design of complex systems. IEEE Trans. Eng. Manage. 28, 71–74 (1981)CrossRef
15.
go back to reference Weeranant, D., Pimapunsri, K.: Application of DSM and simulation technique to improve aircraft maintenance master plan. In: Proceedings of the International Conference on Engineering, Science and Technology, Chonburi, Thailand, pp. 29–33 (2017) Weeranant, D., Pimapunsri, K.: Application of DSM and simulation technique to improve aircraft maintenance master plan. In: Proceedings of the International Conference on Engineering, Science and Technology, Chonburi, Thailand, pp. 29–33 (2017)
16.
go back to reference Yassine, A.A., Falkenburg, D., Chelst, K.: Engineering design management: an information structure approach. Int. J. Prod. Res. 37(13), 2957–2975 (1999)CrossRef Yassine, A.A., Falkenburg, D., Chelst, K.: Engineering design management: an information structure approach. Int. J. Prod. Res. 37(13), 2957–2975 (1999)CrossRef
17.
go back to reference Yassine, A.A.: An introduction to modeling and analyzing complex product development process using the design structure matrix (DSM) method. Urbana 51(9), 1–17 (2004) Yassine, A.A.: An introduction to modeling and analyzing complex product development process using the design structure matrix (DSM) method. Urbana 51(9), 1–17 (2004)
Metadata
Title
Task-Based DSM Model for Aircraft Heavy Maintenance Planning
Authors
Kusol Pimapunsri
Pattarawit Srimuang
Darawan Weeranant
Copyright Year
2024
DOI
https://doi.org/10.1007/978-3-031-59164-8_23

Premium Partners