Skip to main content

Power Technology and Engineering

Ausgabe 2/2013

Inhalt (13 Artikel)

Hydrotechnical Construction

Prediction of electric-power generation at hydroelectric power plants

A. Yu. Aleksandrovskii, P. S. Borshch

Performance Optimization of Hydraulic Turbine by Use of Variable Rotating Speed

Sh. I. Abubakirov, M. E. Lunatsi, T. V. Plotnikova, P. V. Sokur, P. Yu. Tuzov, V. N. Shavarin, Yu. G. Shakaryan, V. A. Shchur

Thermal Power Plants

Prospects for increasing the efficiency of gas turbine and steam-gas units

G. G. Olkhovsky, V. P. Trushechkin

Power Systems and Electric Networks

Short-term optimization of operating modes of power plants

A. S. Taran

Failure of rotor protection due to unreliable contact of the relay brush and the shaft

V. G. Alekseev, A. I. Leviush, A. N. Belozor, I. Akhmadov

Mobile equipment for melting the ice crust on 110 – 220 KV overhead lines

É. E. Son, É. Kh. Isakaev, A. S. Tyuftyaev, D. V. Tereshonok, B. M. Antonov, V. K. Korolev, V. B. Mordynskii, P. A. Konovalov