Skip to main content

2024 | OriginalPaper | Buchkapitel

Reliability and Sensitivity Analysis of a Wastewater Treatment Plant Operating with Two Blowers as a Single System

verfasst von : S. Z. Taj, S. M. Rizwan, Kajal Sachdeva

Erschienen in: Reliability Engineering for Industrial Processes

Verlag: Springer Nature Switzerland

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Utilizing wastewater for irrigation is a pressing necessity in regions grappling with water scarcity. However, before wastewater can be used, it must undergo treatment due to its contamination. Wastewater treatment plants are pivotal in purifying wastewater and rendering it suitable for irrigation. Within these treatment plants, blowers play a crucial role, serving as vital assets. The failure of blowers can result in substantial repair costs. Consequently, it is imperative to conduct a thorough reliability and sensitivity analysis to assess the performance of blowers in wastewater treatment plants. This paper focuses on the reliability and sensitivity analysis of a wastewater treatment facility equipped with two blowers. To support this research, actual failure data from the plant have been collected. When a blower fails, it undergoes an inspection to determine the nature of the failure, which can fall into three categories: instrumental, mechanical, or electrical. The reliability model is constructed by incorporating real-world situations derived from the collected data. This modeling process employs Markov and regenerative processes to estimate key plant performance metrics, including availability, the expected frequency of inspections and repairs, the anticipated busy time for the repairman, and the profit generated. Furthermore, the analysis determines the profit threshold. To understand the influence of various parameters on reliability outcomes, a sensitivity analysis has been undertaken.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Tuteja R, Taneja G (1992) Cost-benefit analysis of a two-server, two-unit, warm standby system with different types of failure. Microelectron Reliab 32(10):1353–1359CrossRef Tuteja R, Taneja G (1992) Cost-benefit analysis of a two-server, two-unit, warm standby system with different types of failure. Microelectron Reliab 32(10):1353–1359CrossRef
2.
Zurück zum Zitat Rizwan S, Taneja G (2000) Profit analysis of a system with perfect repair at partial failure or complete failure. Pure Appl Mathematika Sci 52(1/2):7–14MathSciNet Rizwan S, Taneja G (2000) Profit analysis of a system with perfect repair at partial failure or complete failure. Pure Appl Mathematika Sci 52(1/2):7–14MathSciNet
3.
Zurück zum Zitat Rizwan S, Khurana V, Taneja G (2007) Modelling and optimization of a single-unit PLC system. Int J Model Simul 27(4):361–368CrossRef Rizwan S, Khurana V, Taneja G (2007) Modelling and optimization of a single-unit PLC system. Int J Model Simul 27(4):361–368CrossRef
4.
Zurück zum Zitat Rizwan S, Khurana V, Taneja G (2010) Reliability analysis of a hot standby industrial system. Int J Model Simul 30(3):315–322CrossRef Rizwan S, Khurana V, Taneja G (2010) Reliability analysis of a hot standby industrial system. Int J Model Simul 30(3):315–322CrossRef
5.
Zurück zum Zitat Parashar B, Taneja G (2007) Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Trans Reliab 56(3):534–539CrossRef Parashar B, Taneja G (2007) Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Trans Reliab 56(3):534–539CrossRef
6.
Zurück zum Zitat Mathew A, Rizwan S, Majumder M, Ramachandran K (2011) Reliability modelling and analysis of a two-unit continuous casting plant. J Franklin Inst 348(7):1488–1505CrossRef Mathew A, Rizwan S, Majumder M, Ramachandran K (2011) Reliability modelling and analysis of a two-unit continuous casting plant. J Franklin Inst 348(7):1488–1505CrossRef
7.
Zurück zum Zitat Mathew A, Rizwan S, Majumder M, Ramachandran K, Taneja G (2011) Reliability analysis of an identical two-unit parallel CC plant system operative with full installed capacity. Int J Performab Eng 7(2):179–185 Mathew A, Rizwan S, Majumder M, Ramachandran K, Taneja G (2011) Reliability analysis of an identical two-unit parallel CC plant system operative with full installed capacity. Int J Performab Eng 7(2):179–185
8.
Zurück zum Zitat Padmavathi N, Rizwan S, Pal A, Taneja G (2014) Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season. Int J Sci Stat Comput 5(1):15–23 Padmavathi N, Rizwan S, Pal A, Taneja G (2014) Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season. Int J Sci Stat Comput 5(1):15–23
9.
Zurück zum Zitat Padmavathi N, Rizwan S, Pal A, Taneja G (2014) Probabilistic analysis of a seven-unit desalination plant with minor/major failures and priority given to repair over maintenance. Aryabhatta J Mathem Inf 6(1):219–230 Padmavathi N, Rizwan S, Pal A, Taneja G (2014) Probabilistic analysis of a seven-unit desalination plant with minor/major failures and priority given to repair over maintenance. Aryabhatta J Mathem Inf 6(1):219–230
10.
Zurück zum Zitat Naithani A, Parashar B, Bhatia P, Taneja G (2017) Probabilistic analysis of a 3-unit induced draft fan system with one warm standby with priority to repair of the unit in working state. Int J Syst Assur Eng Manag 8(S2):1383–1391CrossRef Naithani A, Parashar B, Bhatia P, Taneja G (2017) Probabilistic analysis of a 3-unit induced draft fan system with one warm standby with priority to repair of the unit in working state. Int J Syst Assur Eng Manag 8(S2):1383–1391CrossRef
11.
Zurück zum Zitat Ram M, Singh S, Singh V (2013) Stochastic analysis of a standby system with waiting repair strategy. IEEE Trans Syst Man Cybern Syst 43(3):698–707CrossRef Ram M, Singh S, Singh V (2013) Stochastic analysis of a standby system with waiting repair strategy. IEEE Trans Syst Man Cybern Syst 43(3):698–707CrossRef
12.
Zurück zum Zitat Rizwan S, Padmavathi N, Pal A, Taneja G (2013) Reliability analysis of a seven-unit desalination plant with shutdown during winter season and repair / maintenance on FCFS basis. Int J Performab Eng 9(5):523–528 Rizwan S, Padmavathi N, Pal A, Taneja G (2013) Reliability analysis of a seven-unit desalination plant with shutdown during winter season and repair / maintenance on FCFS basis. Int J Performab Eng 9(5):523–528
13.
Zurück zum Zitat Taneja G, Malhotra R (2013) Cost-benefit analysis of a single unit system with scheduled maintenance and variation in demand. J Math Stat 9(3):155–160CrossRef Taneja G, Malhotra R (2013) Cost-benefit analysis of a single unit system with scheduled maintenance and variation in demand. J Math Stat 9(3):155–160CrossRef
14.
Zurück zum Zitat Rizwan S, Thanikal J (2014) Reliability analysis of a wastewater treatment plant with inspection. i-manager’s J Math 3(2):21–26 Rizwan S, Thanikal J (2014) Reliability analysis of a wastewater treatment plant with inspection. i-manager’s J Math 3(2):21–26
15.
Zurück zum Zitat Rizwan S, Thanikal J, Torrijos M (2014) A general model for reliability analysis of a domestic wastewater treatment plant. Int J Condition Monit Diagnostic Eng Manag 17(3):3–6 Rizwan S, Thanikal J, Torrijos M (2014) A general model for reliability analysis of a domestic wastewater treatment plant. Int J Condition Monit Diagnostic Eng Manag 17(3):3–6
16.
Zurück zum Zitat Rizwan S, Thanikal J, Padmavathi N, Yazidi H (2015) Reliability & availability analysis of an anaerobic batch reactor treating fruit and vegetable waste. Int J Appl Eng Res 10(24):44075–44079 Rizwan S, Thanikal J, Padmavathi N, Yazidi H (2015) Reliability & availability analysis of an anaerobic batch reactor treating fruit and vegetable waste. Int J Appl Eng Res 10(24):44075–44079
17.
Zurück zum Zitat Bhardwaj R, Singh R (2016) Stochastic model of a cold-standby system with waiting for arrival and treatment of server. Amer J Oper Res 6:334–342 Bhardwaj R, Singh R (2016) Stochastic model of a cold-standby system with waiting for arrival and treatment of server. Amer J Oper Res 6:334–342
18.
Zurück zum Zitat Niwas R, Kadyan M, Kumar J (2016) MTSF (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty. Int J Syst Assur Eng Manag 7(1):198–204CrossRef Niwas R, Kadyan M, Kumar J (2016) MTSF (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty. Int J Syst Assur Eng Manag 7(1):198–204CrossRef
19.
Zurück zum Zitat Yusuf I (2016) Reliability modelling of a parallel system with a supporting device and two types of preventive maintenance. Int J Oper Res 25(3):269–287MathSciNetCrossRef Yusuf I (2016) Reliability modelling of a parallel system with a supporting device and two types of preventive maintenance. Int J Oper Res 25(3):269–287MathSciNetCrossRef
20.
Zurück zum Zitat Adlakha N, Taneja G, Shilpi (2017) Reliability and cost-benefit analysis of a two-unit cold standby system used for communication through satellite with assembling and activation time. Int J Appl Eng Res 12(20):9697–9702 Adlakha N, Taneja G, Shilpi (2017) Reliability and cost-benefit analysis of a two-unit cold standby system used for communication through satellite with assembling and activation time. Int J Appl Eng Res 12(20):9697–9702
21.
Zurück zum Zitat Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2017) Reliability analysis of rodding anode plant in aluminium industry. Int J Appl Eng Res 12(16):5616–5623 Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2017) Reliability analysis of rodding anode plant in aluminium industry. Int J Appl Eng Res 12(16):5616–5623
22.
Zurück zum Zitat Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2018) Maintenance analysis of a butt thimble removal station in aluminium plant. Int J Mech Eng Technol 9(4):695–703 Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2018) Maintenance analysis of a butt thimble removal station in aluminium plant. Int J Mech Eng Technol 9(4):695–703
23.
Zurück zum Zitat Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019) Reliability analysis of a rodding anode plant in aluminum industry with multiple units’ failure and single repairman. Int J Syst Assur Eng Manag 10(1):97–109CrossRef Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019) Reliability analysis of a rodding anode plant in aluminum industry with multiple units’ failure and single repairman. Int J Syst Assur Eng Manag 10(1):97–109CrossRef
24.
Zurück zum Zitat Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019) Reliability analysis of multiple units with multiple repairmen of rodding anode plant in aluminum industry. Adv Appl Stat 54(1):151–178 Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019) Reliability analysis of multiple units with multiple repairmen of rodding anode plant in aluminum industry. Adv Appl Stat 54(1):151–178
26.
Zurück zum Zitat Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2017) Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories. Int J Appl Eng Res 12(8):1752–1757 Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2017) Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories. Int J Appl Eng Res 12(8):1752–1757
28.
Zurück zum Zitat Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018) Performance and cost-benefit analysis of a cable plant with storage of surplus produce. Int J Mech Eng Technol 9(8):814–826 Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018) Performance and cost-benefit analysis of a cable plant with storage of surplus produce. Int J Mech Eng Technol 9(8):814–826
29.
Zurück zum Zitat Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018) Profit analysis of a cable manufacturing plant portraying the winter operating strategy. Int J Mech Eng Technol 9(11):370–381 Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018) Profit analysis of a cable manufacturing plant portraying the winter operating strategy. Int J Mech Eng Technol 9(11):370–381
30.
Zurück zum Zitat Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2020) Three reliability models of a building cable manufacturing plant: a comparative analysis. Int J Syst Assur Eng Manag 11:239–246CrossRef Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2020) Three reliability models of a building cable manufacturing plant: a comparative analysis. Int J Syst Assur Eng Manag 11:239–246CrossRef
31.
Zurück zum Zitat Ahmad S, Sharma G, Sharma U (2018) Modelling and profit evaluation of a repairable system working with one operative unit and three cold standby units. Int J Math Trends Technol 64(1):65–71CrossRef Ahmad S, Sharma G, Sharma U (2018) Modelling and profit evaluation of a repairable system working with one operative unit and three cold standby units. Int J Math Trends Technol 64(1):65–71CrossRef
32.
Zurück zum Zitat Singh V, Poonia P (2019) Probabilistic assessment of two-unit parallel system with correlated lifetime under inspection using regenerative point technique. Int J Reliab Risk Safety: Theory Appl 2(1):5–14 Singh V, Poonia P (2019) Probabilistic assessment of two-unit parallel system with correlated lifetime under inspection using regenerative point technique. Int J Reliab Risk Safety: Theory Appl 2(1):5–14
33.
Zurück zum Zitat Kadyan S, Malik S, Gitanjali (2020) Stochastic analysis of a three-unit non-identical repairable system with simultaneous working of cold standby units. J Reliab Stat Studies 13(2):385–400 Kadyan S, Malik S, Gitanjali (2020) Stochastic analysis of a three-unit non-identical repairable system with simultaneous working of cold standby units. J Reliab Stat Studies 13(2):385–400
34.
Zurück zum Zitat Kaur R, Ahmad S, Sharma U (2020) Reliability modelling of a gravity die casting system covering seven types of failure categories. Int J New Innov Eng Technol 12(4):107–111 Kaur R, Ahmad S, Sharma U (2020) Reliability modelling of a gravity die casting system covering seven types of failure categories. Int J New Innov Eng Technol 12(4):107–111
36.
Zurück zum Zitat Rizwan S, Al Nabhani H, Al Rahbi Y, Senguttuvan A (2022) Reliability analysis of a three-unit pumping system. Int J Eng Trends Technol 70(6):24–31CrossRef Rizwan S, Al Nabhani H, Al Rahbi Y, Senguttuvan A (2022) Reliability analysis of a three-unit pumping system. Int J Eng Trends Technol 70(6):24–31CrossRef
37.
Zurück zum Zitat Rizwan S, Sachdeva K, Senguttuvan A, Al Rahbi Y (2023) Performability and sensitivity analysis of the three pumps of a desalination water pumping station. Int J Eng Trends Technol 71(1):283–292CrossRef Rizwan S, Sachdeva K, Senguttuvan A, Al Rahbi Y (2023) Performability and sensitivity analysis of the three pumps of a desalination water pumping station. Int J Eng Trends Technol 71(1):283–292CrossRef
38.
Zurück zum Zitat Rizwan S, Sachdeva K, Al Rashdi S, Al Balushi N, Taj S (2023) Reliability and sensitivity analysis of membrane biofilm fuel cell. Int J Eng Trends Technol 71(3):73–80CrossRef Rizwan S, Sachdeva K, Al Rashdi S, Al Balushi N, Taj S (2023) Reliability and sensitivity analysis of membrane biofilm fuel cell. Int J Eng Trends Technol 71(3):73–80CrossRef
39.
Zurück zum Zitat Taj S, Rizwan S (2022) Reliability analysis of a 3-unit parallel system with single maintenance facility. Adv Math Models Appl 7(1):93–103 Taj S, Rizwan S (2022) Reliability analysis of a 3-unit parallel system with single maintenance facility. Adv Math Models Appl 7(1):93–103
40.
Zurück zum Zitat Taj S, Rizwan S (2023) Comparative analysis between three reliability models of a two-unit complex industrial system. J Adv Res Appl Sci Eng Technol 30(2):243–254 Taj S, Rizwan S (2023) Comparative analysis between three reliability models of a two-unit complex industrial system. J Adv Res Appl Sci Eng Technol 30(2):243–254
42.
Zurück zum Zitat Al Abdali Z, Al Alwai S, Al Hosni A, Al Sinani M, Padmavathi N (2021) Reliability analysis of blowers of a wastewater treatment plant. Adv Dyn Syst Appl 16(2):739–754 Al Abdali Z, Al Alwai S, Al Hosni A, Al Sinani M, Padmavathi N (2021) Reliability analysis of blowers of a wastewater treatment plant. Adv Dyn Syst Appl 16(2):739–754
43.
Zurück zum Zitat Misra K (2008) Handbook of performability engineering. 1st illustrated edition Germany. Springer Misra K (2008) Handbook of performability engineering. 1st illustrated edition Germany. Springer
44.
Zurück zum Zitat Sachdeva K, Taneja G, Manocha A (2022) Sensitivity and economic analysis of an insured system with extended conditional warranty. Reliab Theory Appl 17(3(69)):315–327 Sachdeva K, Taneja G, Manocha A (2022) Sensitivity and economic analysis of an insured system with extended conditional warranty. Reliab Theory Appl 17(3(69)):315–327
Metadaten
Titel
Reliability and Sensitivity Analysis of a Wastewater Treatment Plant Operating with Two Blowers as a Single System
verfasst von
S. Z. Taj
S. M. Rizwan
Kajal Sachdeva
Copyright-Jahr
2024
DOI
https://doi.org/10.1007/978-3-031-55048-5_2

Premium Partner