Skip to main content

2024 | OriginalPaper | Buchkapitel

Monte Carlo Simulation for Project Risk Prioritisation

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Qualitative project risk assessment is standard practice in project management and involves prioritising risks using a probability and impact matrix. Due to the shortcomings of using this tool for risk prioritisation (poor resolution, errors, suboptimal resource allocation or ambiguous inputs and outputs, among others), we propose a quantitative prioritisation of project risks in this article, analysing the impact of each risk on the project’s duration and cost objectives.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Acebes, F., De Antón, J., Villafáñez, F., Poza, D.: A matlab-based educational tool for quantitative risk analysis. In: Márquez, F.P.G., Ramírez, I.S., Sánchez, P.J.B., Muñoz, A., del Río, (eds.) IoT and Data Science in Engineering Management: Proceedings of the 16th International Conference on Industrial Engineering and Industrial Management and XXVI Congreso de Ingeniería de Organización, pp. 42–46. Springer International Publishing, Cham (2023). https://doi.org/10.1007/978-3-031-27915-7_8CrossRef Acebes, F., De Antón, J., Villafáñez, F., Poza, D.: A matlab-based educational tool for quantitative risk analysis. In: Márquez, F.P.G., Ramírez, I.S., Sánchez, P.J.B., Muñoz, A., del Río, (eds.) IoT and Data Science in Engineering Management: Proceedings of the 16th International Conference on Industrial Engineering and Industrial Management and XXVI Congreso de Ingeniería de Organización, pp. 42–46. Springer International Publishing, Cham (2023). https://​doi.​org/​10.​1007/​978-3-031-27915-7_​8CrossRef
Zurück zum Zitat Axelos: Managing Successful Projects with PRINCE2®. 6th Editio. Edited by AXELOS Limited. TSO (The Stationery Office) (2017) Axelos: Managing Successful Projects with PRINCE2®. 6th Editio. Edited by AXELOS Limited. TSO (The Stationery Office) (2017)
Zurück zum Zitat European Commission: Project Management Methodology. Guide 3.0. Edited by European Union. Brussels/Luxembourg: Publications Office of the European Union (2018) European Commission: Project Management Methodology. Guide 3.0. Edited by European Union. Brussels/Luxembourg: Publications Office of the European Union (2018)
Zurück zum Zitat International Organization for Standardization (2019) ‘ISO/IEC 31010:2019 Risk management - Risk assessment techniques’ International Organization for Standardization (2019) ‘ISO/IEC 31010:2019 Risk management - Risk assessment techniques’
Zurück zum Zitat Project Management Institute: A Guide to the Project Management Body of Knowledge: PMBoK(R) Guide. Seventh Edition, 7th edn. Project Management Institute Inc., Newtown Square, Pennsylvania (2021) Project Management Institute: A Guide to the Project Management Body of Knowledge: PMBoK(R) Guide. Seventh Edition, 7th edn. Project Management Institute Inc., Newtown Square, Pennsylvania (2021)
Metadaten
Titel
Monte Carlo Simulation for Project Risk Prioritisation
verfasst von
Fernando Acebes
David Curto
José Manuel González-Varona
Javier Pajares
Copyright-Jahr
2024
DOI
https://doi.org/10.1007/978-3-031-57996-7_78

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.