The Regional Price Lists for the Estimation of Construction Costs: A Comparison at National Level

verfasst von : Leopoldo Sdino, Fabiana Forte, Paolo Rosasco

Erschienen in: Science of Valuations

Verlag: Springer Nature Switzerland

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Given the different stages of the development of a building project, the economic planning phase of the intervention is quite strategic for its feasibility (Battisti et al., Land 9(1), (2020); Bottero et al., A literature review on construction costs estimation: Hot topics and emerging trends. Green Energy and Technology, pp 117–131, 2021; Napoli et al., Sustainability 11(4), 2019; Rebaudengo and Prizzon, Lecture notes in computer science (including subseries lecture notes in artificial intelligence and lecture notes in bioinformatics. Springer Verlag, pp 473–484, 2017; Rebaudengo and Piantanida, IOP conference series: materials science and engineering, 2018; Rebaudengo et al., Smart innovation, system and technologies. Springer Science and Business Media Deutschland, pp 635–642, 2019; Sdino and Rosasco, Appraisal and Valuation: Contemporary Issues and New Frontiers. Springer Verlag, 2020). In the public works field, the correct planning and estimation of costs allows an effective and efficient allocation of public economic resources and respect for deadlines, which have a great importance for works destined to essential public services. The last Italian legislation about the planning and construction of public works (Legislative Decree n. 50/2016) has introduced some changes relating the economic planning and cost estimation, the Article n. 23—paragraph 7 establishes that the definitive project of a public work must contain “definitive quantification of the expenditure limit for the realization and the relative time schedule, through the use, where existing, of the price lists prepared by the territorially competent regions and autonomous provinces, in agreement with the Italian territorial divisions of the Ministry of Infrastructure and Transport”. The reference to the regional price lists for the evaluation of the economic amount of a public work (project) aims to establish a single tool for the different operators (public administrators, designers, construction companies, etc.) who have to plan and estimate the costs of the project since the early phases of the design. Unlike the recent past, where the cost estimate of a public (and private) work could be made using municipal or provincial price lists, nowadays the price lists by Italian regions must be taken as a reference. The aim of the legislator is to take as a reference, in the economic planning phase, a single tool for estimating costs, sufficiently representative of the various cost formation functions in the building sector and to consider the specificities of local economic and productive realities. At this time, all Italian regions have a regional Price List which replace those developed on a local basis; their use to estimate the cost to be assumed as a basis for the tender has eliminated the problem of estimating, for the same project, different costs depending on the local Price List utilized. For a public work, any differences of the construction cost estimated in the design phase can be justified only by the different location of the work at a regional level and no longer provincial or municipal level. Taking as reference a case study relating to the construction of a medium-sized hospital (300 beds), this study aims to develop a comparison of unit costs derived from the analysis of the price lists of twenty Italian regions. The aim is to verify whether, for the same project, the construction costs of the main workings vary in relation to the regional location and what is the average difference. This is important not only for an efficient economic planning of public works by local and national public administrations (preparation of the necessary budget, etc.) but also for a more effective control of the differences between the initial and final budgets. The regional Price List for estimating costs represent new tool for an efficient valuation and governance of the public projects developed by public administrations, a topic debated within the “Evaluation Sciences” conference organized by Siev, in Syracuse (Italy), in July 2019.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
Società Italiana di Estimo e Valutazione (Italian Company of Appraisal and Evaluation).
 
2
Many Italian regions provide the Price List with the price analysis of each workings. If these were not available, they were requested to the regions.
 
3
It is a dimensionless statistical parameter expressed in percentage terms used to describe the variability of a data series; it is calculated by dividing the standard deviation by the sample mean and multiplying the result by 100. It is also called the “coefficient of variation”.
 
4
It should be remembered that this cost takes into account the contribution of only 19 workings selected for the survey and, therefore, it represents a partial value of the total change in the construction cost.
 
Literatur
1.
Zurück zum Zitat ANCE (Associazione Nazionale Costruttore Edili) (2019) Osservatorio Congiunturale sull'industria delle Costruzioni – Rapporto 2019, Roma, Gennaio ANCE (Associazione Nazionale Costruttore Edili) (2019) Osservatorio Congiunturale sull'industria delle Costruzioni – Rapporto 2019, Roma, Gennaio
2.
Zurück zum Zitat Battisti F, Campo O, Forte F (2020) A methodological approach for the assessment of potentially buildable land for tax purposes: The Italian case study. Land 9(1):8 Battisti F, Campo O, Forte F (2020) A methodological approach for the assessment of potentially buildable land for tax purposes: The Italian case study. Land 9(1):8
3.
Zurück zum Zitat Bottero M, Caprioli C, Oppio A (2021) A literature review on construction costs estimation: hot topics and emerging trends. Green Energy and Technology, pp 117–131 Bottero M, Caprioli C, Oppio A (2021) A literature review on construction costs estimation: hot topics and emerging trends. Green Energy and Technology, pp 117–131
4.
Zurück zum Zitat Capolongo S, Sdino L, Dell'Ovo M, Moioli R, Della Torre S (2019) How to assess urban regeneration proposals by considering conflicting values. Sustainability 11(14):3877 Capolongo S, Sdino L, Dell'Ovo M, Moioli R, Della Torre S (2019) How to assess urban regeneration proposals by considering conflicting values. Sustainability 11(14):3877
5.
Zurück zum Zitat CRESME (2019) Il mercato delle costruzioni 2020 - XXVII Rapporto Congiunturale e Previsionale. Cresme, Bologna CRESME (2019) Il mercato delle costruzioni 2020 - XXVII Rapporto Congiunturale e Previsionale. Cresme, Bologna
6.
Zurück zum Zitat Napoli G, Giuffrida S, Trovato MG (2019) Efficiency versus fairness in the management of public housing assets in Palermo (Italy). Sustainability 11(4) Napoli G, Giuffrida S, Trovato MG (2019) Efficiency versus fairness in the management of public housing assets in Palermo (Italy). Sustainability 11(4)
7.
Zurück zum Zitat Rebaudengo M, Prizzon F (2017) Assessing the investments sustainability after the new code on public contracts. In: Murgante B, Apduhan BO, Borruso G, Cuzzocrea A, Torre CM, Gervasi O, Tania D, Stankova E, Rocha AMAC, Misra S (eds) Lecture notes in computer science (including subseries lecture notes in artificial intelligence and lecture notes in bioinformatics, vol 10409 LNCS. Springer: Verlag, pp 473–484 Rebaudengo M, Prizzon F (2017) Assessing the investments sustainability after the new code on public contracts. In: Murgante B, Apduhan BO, Borruso G, Cuzzocrea A, Torre CM, Gervasi O, Tania D, Stankova E, Rocha AMAC, Misra S (eds) Lecture notes in computer science (including subseries lecture notes in artificial intelligence and lecture notes in bioinformatics, vol 10409 LNCS. Springer: Verlag, pp 473–484
8.
Zurück zum Zitat Rebaudengo M, Piantanida P (2018) Maintenance of buildings: Italian examples of deviations between planned and incurred costs. In: IOP conference series: materials science and engineering, vol 351, Issue 1, Article n. 0120132017 Rebaudengo M, Piantanida P (2018) Maintenance of buildings: Italian examples of deviations between planned and incurred costs. In: IOP conference series: materials science and engineering, vol 351, Issue 1, Article n. 0120132017
9.
Zurück zum Zitat Rebaudengo M, Innocente G, Crisafulli A (2019) PPs palatability to complete unfinished public works in Italy. In: Bevilacqua C, Calabrò F, Della Spina L (eds) Smart innovation, system and technologies, vol 100. Springer Science and Business Media Deutschland, pp 635–642 Rebaudengo M, Innocente G, Crisafulli A (2019) PPs palatability to complete unfinished public works in Italy. In: Bevilacqua C, Calabrò F, Della Spina L (eds) Smart innovation, system and technologies, vol 100. Springer Science and Business Media Deutschland, pp 635–642
10.
Zurück zum Zitat Sdino L, Magoni S (2018) The sharing economy and real estate market: the phenomenon of shared houses. Integrated evaluation for the management of contemporary cities – green energy and technology. Springer, Verlag, pp 241–251 Sdino L, Magoni S (2018) The sharing economy and real estate market: the phenomenon of shared houses. Integrated evaluation for the management of contemporary cities – green energy and technology. Springer, Verlag, pp 241–251
11.
Zurück zum Zitat Sdino L, Rosasco P (2020) The regional price list for estimating the costs of construction. In: Morano P, Oppio A, Rosato P, Sdino L, Tajani F (eds) Appraisal and valuation: contemporary issues and new frontiers. Springer: Verlag Sdino L, Rosasco P (2020) The regional price list for estimating the costs of construction. In: Morano P, Oppio A, Rosato P, Sdino L, Tajani F (eds) Appraisal and valuation: contemporary issues and new frontiers. Springer: Verlag
Metadaten
Titel
The Regional Price Lists for the Estimation of Construction Costs: A Comparison at National Level
verfasst von
Leopoldo Sdino
Fabiana Forte
Paolo Rosasco
Copyright-Jahr
2024
DOI
https://doi.org/10.1007/978-3-031-53709-7_17